Medical Library Move update
No Comments Yet so far
Leave a comment
4/21/09
We moved into our new building in July 2008. On July 24 the lower level flooded. Update:
We have moved all the books and journals back to the old stacks so cleanup can start. Molded wall board is being removed and repaired. New carpet will be installed. Repairs to the motorized compact shelving must be made. Workers have built a levy around the outside perimeter of the library grounds to avoid rain water from pooling and running down to lower level. The sidewalks have been reset to go over the levy.
Leave a Comment
No Comments Yet so far
Leave a comment
Leave a comment
Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <pre> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


